On-site quick reference

General guidance to read before or between jobs. The chat assistant answers your specific questions only — it will not repeat this page.

Part P — electrical work

  • New circuits, consumer unit replacement, and work in special locations (e.g. bathrooms) may be notifiable — see Approved Document P and BS 7671.
  • Dwellings: registered competent-person scheme or Building Control sign-off for notifiable work.
  • Keep evidence — test results, certificates, and as-fitted diagrams.

Building Control — common triggers

Work typeTypical approval
Structural changesBuilding Control
Extensions / loft conversionsBuilding Control
Notifiable electrical (Part P)Competent person or BC
Ventilation in new build / extensionAD F — check spec
EV charge pointsAD S
Access alterations (ramps, WCs)AD M

Quick checklist on site

  1. What type of work is it — electrical, structure, ventilation, access?
  2. Domestic or commercial? New build or retrofit?
  3. Is it likely notifiable or needs a Building Notice?
  4. Do you have drawings, specs, and test records?
  5. If unsure — stop and call Building Control or your supervisor.

Guidance only

This page is not legal advice or a substitute for official Approved Documents, BS 7671, or sign-off from Building Control or a qualified designer.